If someone has a 4.4KW 3 phase supply here in Spain is it a total of 4.4KW or 4.4KW per phase?
Cheers
Gerry
Power supply in Spain
Power supply in Spain
Gerry Harris
-
- Resident
- Posts: 736
- Joined: Mon Apr 15, 2013 9:03 pm
- Location: Estepona
Re: Power supply in Spain
Hi Gerry
It was explaned to me by an Electrician,a friend of mine, that each Phase will have a limit of 1.466KW going through this connection at any oe time . Hope this helps
David
It was explaned to me by an Electrician,a friend of mine, that each Phase will have a limit of 1.466KW going through this connection at any oe time . Hope this helps
David
Re: Power supply in Spain
Hi David
I hope that uisn't correct as you couldn't run an electric kettle off that.
Cheers
Gerry
I hope that uisn't correct as you couldn't run an electric kettle off that.
Cheers
Gerry
Gerry Harris
-
- Resident
- Posts: 736
- Joined: Mon Apr 15, 2013 9:03 pm
- Location: Estepona
Re: Power supply in Spain
Hi Gerry
The way he explained it to me is if you have 4.4KW 3 phase electricity then it is split between these phases at 1.466 each and not a total of 4.4KW for each phase. this is where the ICP trips your electricity if you use too much.
David
The way he explained it to me is if you have 4.4KW 3 phase electricity then it is split between these phases at 1.466 each and not a total of 4.4KW for each phase. this is where the ICP trips your electricity if you use too much.
David
-
- Andalucia Guru
- Posts: 16058
- Joined: Sun Oct 24, 2004 10:42 pm
- Location: La Herradura, Costa Tropical, Granada
Re: Power supply in Spain
I think you will find that the 4.4kw is for each phase giving 13.2kw overall. That is what we have. Each phase has a 20a ICP.
Sid
Sid
Re: Power supply in Spain
Thanks Sid. That makes sense to me and as I would expect it to be but just checking that Spain doesn't calculate it differently.
Cheers
Gerry
Cheers
Gerry
Gerry Harris
-
- Andalucia Guru
- Posts: 16058
- Joined: Sun Oct 24, 2004 10:42 pm
- Location: La Herradura, Costa Tropical, Granada
Re: Power supply in Spain
Actually the contracted amount is 13.856Kw. How they arrive at that figure rather than 13.2Kw I know not!
Sid
Sid
Who is online