Power supply in Spain

Postby gerryh » Thu Mar 07, 2019 8:43 am

If someone has a 4.4KW 3 phase supply here in Spain is it a total of 4.4KW or 4.4KW per phase?
Cheers
Gerry
Gerry Harris

pensure1988
Resident
Posts: 736
Joined: Mon Apr 15, 2013 9:03 pm
Location: Estepona

Re: Power supply in Spain

Postby pensure1988 » Thu Mar 07, 2019 9:05 am

Hi Gerry

It was explaned to me by an Electrician,a friend of mine, that each Phase will have a limit of 1.466KW going through this connection at any oe time . Hope this helps

David

User avatar
gerryh
Andalucia Guru
Posts: 8046
Joined: Sat Jan 12, 2008 6:17 pm
Location: Cajiz, Malaga

Re: Power supply in Spain

Postby gerryh » Thu Mar 07, 2019 9:19 am

Hi David
I hope that uisn't correct as you couldn't run an electric kettle off that.
Cheers
Gerry
Gerry Harris

pensure1988
Resident
Posts: 736
Joined: Mon Apr 15, 2013 9:03 pm
Location: Estepona

Re: Power supply in Spain

Postby pensure1988 » Thu Mar 07, 2019 9:27 am

Hi Gerry

The way he explained it to me is if you have 4.4KW 3 phase electricity then it is split between these phases at 1.466 each and not a total of 4.4KW for each phase. this is where the ICP trips your electricity if you use too much.

David

El Cid
Andalucia Guru
Posts: 16058
Joined: Sun Oct 24, 2004 10:42 pm
Location: La Herradura, Costa Tropical, Granada

Re: Power supply in Spain

Postby El Cid » Thu Mar 07, 2019 9:38 am

I think you will find that the 4.4kw is for each phase giving 13.2kw overall. That is what we have. Each phase has a 20a ICP.

Sid

User avatar
gerryh
Andalucia Guru
Posts: 8046
Joined: Sat Jan 12, 2008 6:17 pm
Location: Cajiz, Malaga

Re: Power supply in Spain

Postby gerryh » Thu Mar 07, 2019 11:22 am

Thanks Sid. That makes sense to me and as I would expect it to be but just checking that Spain doesn't calculate it differently.
Cheers
Gerry
Gerry Harris

El Cid
Andalucia Guru
Posts: 16058
Joined: Sun Oct 24, 2004 10:42 pm
Location: La Herradura, Costa Tropical, Granada

Re: Power supply in Spain

Postby El Cid » Thu Mar 07, 2019 11:35 am

Actually the contracted amount is 13.856Kw. How they arrive at that figure rather than 13.2Kw I know not!